Mittal Solar SolutionsMittal Solar Solutions
Subsidy & Government Schemes

Government support that makes solar more affordable

Several central and state schemes support solar adoption in Uttar Pradesh. Here's what exists, who qualifies, and how the application process works.

Government subsidy is one of the biggest factors in making solar affordable — but it's also where most delays and rejections happen, usually due to incomplete or incorrectly filed paperwork.

We handle subsidy and net metering documentation as part of our standard service, so you don't have to navigate government portals and forms on your own.

Scheme names, subsidy amounts and eligibility criteria are set by government authorities and are periodically revised. The information below reflects our current understanding — we confirm the exact, up-to-date figures applicable to your case during your free site survey.

PM Surya Ghar Muft Bijli Yojana

Government of India (Ministry of New and Renewable Energy)

A central government scheme supporting residential rooftop solar installation, aimed at helping households reduce or eliminate their electricity bills through subsidised solar systems.

  • • Indian residential electricity consumer with a valid connection
  • • Ownership or documented rights over the rooftop where the system will be installed
  • • Roof suitable for solar installation (checked during site survey)

Subsidy is provided on a per-kW basis for residential systems up to a defined capacity, with the exact slab-wise amount set by the scheme guidelines in force at the time of application.

UPNEDA Support (Uttar Pradesh)

Uttar Pradesh New and Renewable Energy Development Agency

UPNEDA is the state nodal agency for renewable energy in Uttar Pradesh, and coordinates state-level facilitation, empanelment of vendors, and processing support for rooftop solar in the state.

  • • Uttar Pradesh electricity consumers (residential, commercial, institutional as applicable)
  • • Installation carried out via a UPNEDA-recognised or empanelled process

State-level facilitation and, where applicable, additional support — details and current updates are confirmed at the time of application, as these are periodically revised by UPNEDA.

PM-KUSUM (for agricultural solar pumps)

Government of India (Ministry of New and Renewable Energy)

Supports farmers in installing standalone solar-powered agricultural pumps and solarising existing grid-connected pumps, reducing dependence on diesel and grid power for irrigation.

  • • Individual farmers, farmer groups, cooperatives, or panchayats as applicable under the scheme component
  • • Land ownership or usage rights documentation for pump installation

Subsidy support is provided toward the cost of the solar pump system, with the applicable component and percentage depending on the specific PM-KUSUM component and current guidelines.

How the subsidy application process works

1

Free site survey & eligibility check

We assess your property and confirm which schemes you're likely eligible for.

2

Document collection

We help you gather the documents required for your specific application.

3

Application filing

We file your subsidy and net metering applications through the relevant portals on your behalf.

4

Installation & inspection

Your system is installed, and any required inspection is coordinated with the electricity board.

5

Subsidy disbursal & net metering activation

Once approved, subsidy is disbursed as per scheme rules, and your net metering connection is activated.

Documents typically required

Proof of identity (Aadhaar or equivalent government ID)
Proof of electricity connection (recent electricity bill / consumer number)
Proof of property ownership or rooftop usage rights
Bank account details (for subsidy disbursal)
Passport-size photograph

Subsidy & schemes — frequently asked questions

The exact amount depends on your system size, category (residential/commercial/agricultural) and the scheme guidelines in force at the time you apply. We calculate this precisely for your case during your free site survey.

Timelines depend on the relevant government department and portal processing times, which can vary. We keep you updated at each stage of your application.

Most rejections happen due to incomplete or incorrect documentation. Since we prepare and file the paperwork on your behalf, we work to get it right the first time, and assist with resubmission if needed.

Central subsidy under PM Surya Ghar is targeted at residential customers. Commercial and industrial customers may have access to different benefits such as accelerated depreciation — we'll explain what applies to you.

No — subsidy and net metering documentation is included as part of our standard service for eligible customers.

Scheme names, subsidy amounts, eligibility criteria and application processes are determined by the relevant government authorities and are subject to change. This page reflects our current understanding at the time of writing and should not be treated as official scheme documentation — we confirm the latest applicable details with you directly before you apply.

Find out what subsidy you're eligible for

Book a free site survey and we'll check your eligibility across all applicable schemes.

Call NowWhatsApp UsGet a Free Quote